Load Flow, Short Circuit, and Harmonic

Analysis Study
 

Owner:     Tinker AFB, OK
Description:    System study for a jet engine repair facility. Study was limited to the engine parts heat treatment area of the plant where motor failure problems were experienced. Involved subsystem of four unit substations.
 

 

Load Flow, Short Circuit, and Coordination

Study
 

Owner:    Kwikset, Bristow OK
Description:    System study for an industrial manufacturing facility for door locksets consisting of 3 each 1-2.5-MVA unit-substations.

Load Flow and Short Circuit Study
 

Owner:    Wolverine Tube Plant, Shawnee, OK
Description:    System study for 300+ bus industrial manufacturing facility consisting of 9 each 1-1.5-MVA unit-substations Subcontract with C.H. Guernsey & Co. Oklahoma City, OK. Also provided on going support to the plant for system upgrades and power quality solutions.

Tulsa Intl. Airport Bulk Storage and Fuel Distribution
 

Owner:    Southwest Airlines and Aircraft Fueling Systems Inc., Tulsa, OK 
 
Description:    Aboveground jet fuel storage and pumping for aircraft tank truck fueling operation. Design consultant for power, lighting, and PLC control system

Treatment Plant
 

Owner:    Ft. Sill, OK
 
Description:    20-mgd plant upgrade. Cathodic protection for all comminutors and yard piping using impressed current systems.

American Airlines Relocate Wheel Shop
 

Owner:    American Airlines, Tulsa OK Turbine Engine Overhaul Facility
 
Description:    Consolidate two existing aircraft wheel repair shops into one 22,500 SF facility by conversion of an existing warehouse. Design of all electrical systems. Subcontract for Holmes Architectural Services, Tulsa, OK

Landing Gear Shop Modification/Expansion
 

Owner:    American Airlines, Tulsa OK Turbine Engine Overhaul Facility
 
Description:    Install new EPA approved paint booth for large aircraft landing gear and relocate 30 large milling machines. Subcontract for Holmes Architectural Services, Tulsa, OK.

Degreaser Tank Mods 

Owner:    American Airlines, Tulsa OK Turbine Engine Overhaul Facility
 
Description:    Change out of seven solvent tanks and exhaust system changes to meet new EPA vapor emission standards. Subcontract with Holmes Architectural Services, Tulsa, OK.

Landing Gear Paint Booth
 

Owner:    American Airlines, Tulsa OK Turbine Engine Overhaul Facility
 
Description:    Provide plans and specifications for new spray paint booth for large landing gear assemblies in accordance with current EPA criteria. Subcontract with Holmes Architectural Services, Tulsa, OK.

Develop safety standards for portable welders
 

Owner:    Matrix Service Inc. Tulsa, OK
 
Description:    Included grounding procedures for mobile welders, G.F.C.I. operational problems and power receptacle failure analysis.

Tulsa Intl. Airport- Relocate Security Fence:
 

Owner:    Tulsa Airport Authority
 
Description:    Relocate two automatic ramp security gates and related fencing, obstruction lights, and security access system. Subcontract with Poe & Assoc., Tulsa, OK

Wister Lake, OK Outlet Works
 

Owner:    U.S. Army Corps of Engineers, Tulsa District
 
Description:    Slide gate controls & major electrical rehab

Skiatook Lake, OK Outlet Works
 

Owner:    U.S. Army Corps of Engineers, Tulsa District
 
Description:    Slide gate controls and all electrical systems for the dam structures.

Arcadia Lake, OK Outlet Works
 

Owner:    U.S. Army Corps of Engineers, Tulsa District
 
Description:    Slide gate controls and all electrical systems for the dam structures.